CTrain (previously branded C-Train) is a light rail
rapid transit Rapid transit or mass rapid transit (MRT), also known as heavy rail or metro, is a type of high-capacity public transport generally found in urban areas. A rapid transit system that primarily or traditionally runs below the surface may be ...
system in Calgary, Alberta, Canada. Most of the network functions as a
light metro A medium-capacity system (MCS), also known as light rapid transit or light metro, is a rail transport system with a capacity greater than light rail, but less than typical heavy-rail rapid transit. MCS’s trains are usually 1-4 cars, or 1 lig ...
, though in the free-fare zone that runs through the downtown core the Red and Blue lines operate like a urban tramway (this transition occurs due to the density of stations in the free-fare zone, and is possible due to the design of the rail vehicles and their ability to operate on both segregated and road-integrated tracks). The CTrain began operation on May 25, 1981 and has expanded as the city has increased in population. The system is operated by
Calgary Transit Calgary Transit is the public transit agency which is owned and operated by the city of Calgary, Alberta, Canada. In 2019, an estimated 106.5 million passengers boarded approximately 1,155 Calgary Transit vehicles. It operates light metro (LRT), u ...
, as part of the Calgary municipal government's transportation department. In , the system had a ridership of , or about per weekday as of , making it one of the busiest light rail transit systems in North America. About 45% of workers in Downtown Calgary take the CTrain to work.


History

The idea of rail transit in Calgary originated in a 1967 Calgary transportation study, which recommended a two-line
metro Metro, short for metropolitan, may refer to: Geography * Metro (city), a city in Indonesia * A metropolitan area, the populated region including and surrounding an urban center Public transport * Rapid transit, a passenger railway in an urb ...
system to enter service in 1978. The original plans had called for two lines: *a northwest-to-south line (on a similar routing to the present-day Northwest and South lines) between the original Banff Trail station (at
Crowchild Trail Crowchild Trail is a major expressway in western Calgary, Alberta. The segment from the 12 Mile Coulee Road at the edge of the city to 16 Avenue NW (Trans-Canada Highway, Highway 1) is designated as Highway 1A by Alberta Transportation ...
and Northland Drive, between the present-day Brentwood and Dalhousie stations) and Southwood station (at Southland Drive, roughly at the location of the present-day Southland station, with five stations in downtown underneath 7 Avenue; and *the west line, which ran from downtown to the community of Glendale, primarily along the 26 Avenue SW corridor. A fourth line, a north central line running from downtown to Thorncliffe mostly along Centre Street was also envisioned, but was thought to be beyond the scope of the study. However, a building boom in the 1970s had caused the heavy rail concept to fall out of favour due to the increased costs of construction, with light rail as its replacement. LRT was chosen over dedicated busways and the expansion of the Blue Arrow bus service (a service similar to bus rapid transit today) because light rail has lower long-term operating costs and to address traffic congestion problems. The Blue Arrow service ended in 2000. The present-day CTrain originated in a 1975 plan, calling for construction of a single line, from the downtown core ( 8 Street station) to Anderson Road (the present-day Anderson station). The plan was approved by City Council in May 1977, with construction of what would become the LRT's "South Line" beginning one month later. The South Line opened on May 25, 1981.
Oliver Bowen Oliver Bowen (December 21, 1942 – January 1, 2000) was a Canadian engineer who managed the design and construction of the first line of Calgary's light rail transit system: the CTrain. The City of Calgary acknowledged his engineering work by n ...
designed the CTrain system. Though the South Line was planned to extend to the northwest, political pressures led to the commission of the "Northeast Line", running from
Whitehorn station Whitehorn station is a CTrain light rail station in Calgary, Alberta Calgary ( ) is the largest city in the western Canadian province of Alberta and the largest metro area of the three Prairie Provinces. As of 2021, the city proper had a p ...
(at 36 Street NE and 39 Avenue NE) to the downtown core, with a new downtown terminal station for both lines at 10 Street SW, which opened on April 27, 1985. The Northwest Line, the extension of the South Line to the city's northwest, was opened on September 17, 1987, in time for the 1988 Winter Olympics. This line ran from the downtown core to University station, next to the
University of Calgary The University of Calgary (U of C or UCalgary) is a public research university located in Calgary, Alberta, Canada. The University of Calgary started in 1944 as the Calgary branch of the University of Alberta, founded in 1908, prior to being ins ...
campus. Since then, all three lines have been extended incrementally, with most of the stations commissioned and built in the 2000s (with the exception of Brentwood which opened in 1990, three years after the original Northwest line opened): The West Line, the extension of the Northeast Line, opened for revenue service on December 10, 2012 as the first new line to open in 25 years. The line runs for 8.2 km from Downtown West–Kerby station on 7 Avenue at 11 Street SW at the west end of Downtown, westward to 69 Street station located at the intersection of 17 Avenue and 69 Street SW.


Operations


Lines

The CTrain system has two routes, designated as the and the . They have a combined route length of . Much of the South leg of the system shares the right of way of the Canadian Pacific Railway and there is a connection from the light rail track to the CPR line via a track switch near
Heritage station In commercial radio, a heritage station is an AM radio station that has broadcast a specific format for a sustained period of time, since its beginning; usually since the 1930s or 1940s, in some cases the 1920s. Also, the call letters will have r ...
. The longer route (Red Line; serves the southern and northwestern areas of the city. The shorter route (Blue Line; long) serves the northeastern and western sections of the city. Most track is at grade, with its own
right-of-way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
. The downtown portion is a shared right-of-way, serving both routes along the 7th Avenue South
transit mall A transit mall is a street, or set of streets, in a city or town along which automobile traffic is prohibited or greatly restricted and only public transit vehicles, bicycles, and pedestrians are permitted. Transit malls are instituted by communi ...
at street level. This portion is a
zero-fare Free public transport, often called fare-free public transit or zero-fare public transport, refers to public transport funded in full by means other than by collecting fares from passengers. It may be funded by national, regional or local gove ...
zone and serves as a downtown
people mover A people mover or automated people mover (APM) is a type of small scale automated guideway transit system. The term is generally used only to describe systems serving relatively small areas such as airports, downtown districts or theme parks. ...
. The tracks split at the east and west ends of downtown into lines leading to the south, northeast, west and northwest residential neighbourhoods of Calgary. Six percent of the system is underground, and seven percent is grade-separated (elevated). Trains are powered by overhead electric wires, using pantographs to draw power. In the first quarter of 2015, the CTrain system had an average of 333,800 unlinked passenger trips per weekday, making it the busiest light rail system in North America. Ridership has declined slightly since reaching this peak, coinciding with a recession in the local economy. In 2007, 45% of the people working in downtown Calgary took transit to work; the city's objective is to increase that to 60%.


Rolling stock

The system initially used Siemens-Duewag U2 DC LRVs (originally designed for German metros), and used by the
Frankfurt U-Bahn The Frankfurt U-Bahn is a Stadtbahn system serving Frankfurt, Hesse, Germany. Together with the Rhine-Main S-Bahn and the Frankfurt Straßenbahn, it forms the backbone of the public transport system in Frankfurt. Its name derives from the Ger ...
. The slightly earlier
Edmonton Light Rail Transit Edmonton Light Rail Transit, commonly referred to as the LRT, is a light rail system in Edmonton, Alberta. Part of the Edmonton Transit Service (ETS), the system has 18 stations on two lines and of track. As of 2018, it is number seven on the ...
, and the slightly later
San Diego Trolley The San Diego Trolley is a light rail system operating in the metropolitan area of San Diego. It is known colloquially as "The Trolley". The Trolley's operator, San Diego Trolley, Inc. (SDTI), is a subsidiary of the San Diego Metropolitan Tra ...
were built at approximately the same time and used the same commercial off-the-shelf German LRVs rather than custom-designed vehicles such as were used on the
Toronto streetcar system The Toronto streetcar system is a network of nine streetcar routes in Toronto, Ontario, Canada, operated by the Toronto Transit Commission (TTC). It is the busiest light-rail system in North America. The network is concentrated primarily in D ...
and the
Vancouver SkyTrain SkyTrain is the medium-capacity rapid transit system in the Metro Vancouver Regional District, serving Vancouver, British Columbia, Canada. SkyTrain has of track and uses fully automated trains on grade-separated tracks running on underground ...
. U2 vehicles constituted the entire fleet in Calgary until July 2001, when the first
Siemens SD-160 The SD-100 and SD-160 are light rail vehicles (LRV) that were manufactured by Siemens Mobility between 1992 and 2013 for the North American market. The vehicles were all constructed at the Siemens facility in Florin, California. The primary di ...
cars were delivered. Eighty-three U2 DCs were delivered to Calgary over three separate orders; 27 in 1981, three in 1983, and 53 in 1984 and are numbered 2001–2083. As of March, 2020, 39 out of the original 83 U2 DCs remain in service, plus car 2090. The success of the first North American LRT systems inspired Siemens to build an LRV plant in
Florin, California Florin is a census-designated place (CDP) in Sacramento County, California, United States. It is part of the Sacramento– Roseville–Folsom Metropolitan Statistical Area. The population was 52,388 at the 2020 census, up from 47,513 at th ...
. Siemens now supplies one-third of North American LRVs and has supplied over 1000 vehicles to 17 North American systems. This will include 258 vehicles for Calgary when the current order of
Siemens S200 The Siemens S200 is a high-floor light rail vehicle (LRV) manufactured by Siemens Mobility in Florin, California. The S200 succeeds the SD-100, SD-160, SD-400 and SD-460 as the high-floor light rail vehicle for the North American market and i ...
vehicles is completed. The following LRVs have been retired: Note: units in parentheses in the first row in the above table were retired at end of life, but are also listed in rows below. In 1988, the Alberta Government purchased from Siemens two U2 AC units, the first of their kind in North America, for trials on both the Edmonton and Calgary LRT systems. The cars were originally numbered 3001 and 3002 and served in Edmonton from 1988 to spring 1990. These LRVs came to Calgary in the summer of 1990 and in September, Calgary Transit decided to purchase the cars from the province and then applied the CT livery to the cars (they were previously plain white in both Edmonton and Calgary). They retained their original fleet numbers of 3001 and 3002 until 1999, when CT renumbered the cars 2101 and 2102. Initially, these two cars were only run together as a two-car consist as they were incompatible with the U2 DCs. In 2003, Calgary Transit made the two U2 ACs compatible as slave cars between two SD-160s and have been running them like this ever since. In July 2001, Calgary Transit brought the first of 15 new SD-160 LRVs into service to accommodate the South LRT Extension Phase I and increased capacity. Throughout 2003, another 17 SD-160 LRVs were introduced into the fleet to accommodate the northwest extension to Dalhousie as well as the South LRT Extension Phase II. However, demand for light rail has exploded in recent years. In the decade prior to 2006, the city's population grew by 25% to over 1 million people, while ridership on the CTrain grew at twice that rate, by 50% in only 10 years. This resulted in severe overcrowding on the trains and demands for better service. In December, 2004, city council approved an order for 33 additional SD-160 vehicles from Siemens to not only address overcrowding, but to accommodate the northeast extension to McKnight–Westwinds and the northwest extension to Crowfoot. These new SD–160s started to enter service in November, 2006. In December 2006, CT extended the order by seven cars to a total of 40 cars, which had all been delivered by the spring of 2008. This brought the total of first-generation SD–160s to 72 cars numbered 2201 – 2272. These cars were all delivered without air conditioning, and retrofitted with air conditioning between 2009 and 2011. In November 2007 city council approved purchasing another 38 SD-160 Series 8 LRVs to be used in conjunction with the West LRT extension (2012) and further expansions to the northeast (Saddletowne 2012) and northwest legs (Tuscany 2014). These are new-generation train cars with many upgraded features over the original SD-160s including factory equipped air conditioning and various cosmetic and technical changes. These units started to enter service in December 2010 and are numbered 2301–2338. As of May 2012, all had entered revenue service. In September 2013, Calgary Transit ordered 63 S200 LRVs to provide enough cars to run four-car trains, and to retire some of its Siemens-Duewag U2s, which are nearing the end of their useful lifespans. Some of the 80 U2 cars were 34 years old, and all of them had traveled at least . The first of the new cars arrived in January, 2016 and delivery was expected take two years. The front of the new cars is customized to resemble a hockey goalie's mask, and they include such new features as heated floors for winter and air conditioning for summer. They also now have high-resolution video cameras covering the entire interior and exterior of the vehicles for security purposes. On November 18, 2016, Calgary Transit announced the retirement of the first CTrain LRV purchased, car 2001. Some of the Siemens Duewag U2 cars will be phased out as the new Siemens S200 cars come online.


Four car trains

In late 2015 Calgary Transit began operating four-car LRT trains on the CTrain system. The lengthening of trains was done to alleviate overcrowding as the system was already carrying more than 300,000 passengers per day, and many trains were overcrowded. The lengthening of trains increased the maximum capacity of each train from 600 to 800 passengers, so when enough new LRT cars arrived to lengthen all trains to four cars, the upgrade increased the LRT system capacity by 33%. Since the platforms on the original stations were designed to only accommodate three-car trains, this required lengthening most of the platforms on the 45 stations on the system and building new electrical substations to power the longer trains. To operate the new four-car trains, the city ordered 63 new cars, although 28 of them were intended to replace the original U2 LRT cars, which have as many as 2.8 million miles on them and are approaching the end of their service lives. Many of the older stations were also worn out by high passenger traffic, and the platforms needed to be rebuilt anyway. Since the start of the pandemic though, Calgary Transit is no longer running 4 car trains and continues to only run 3 cars.


Fares

Rides taken solely within the downtown are free; the rest of the network operates under a
proof of payment Proof-of-payment (POP) or proof-of-fare (POF) is an honor-based fare collection system used on many public transportation systems. Instead of checking each passenger as they enter a fare control zone, passengers are required to carry a ticket, p ...
system, with random fare inspections. This is known as the 7th Avenue Free Fare Zone and encompasses all CTrain stations along 7th Avenue. Fares and passes could be purchased from
ticket vending machine A ticket machine, also known as a ticket vending machine (TVM), is a vending machine that produces paper or electronic tickets, or recharges a stored-value card or smart card or the user's mobile wallet, typically on a smartphone. For instanc ...
s at any station. Coins, debit and credit cards can be used at the machines, but bills could not be used at the machines. Fares could also be purchased online through the MyFare app or at a Calgary Transit Customer Service Centre. Day passes and monthly passes could also be purchased. Day passes are valid until the end of service on the day of purchase and monthly passes are valid until the end of the month. Prices are reduced for seniors and students. Children under 5 years old could ride for free as well as pets. Special low-income passes and senior annual passes are also available, and eligible post-secondary students enjoy unlimited access to the network through the U-Pass ( universal transit pass) program.


Route details

There are two light rail lines in operation: the Red Line running from the far southern to the far northwestern suburbs of Calgary (Somerset/Bridlewood–Tuscany), and the Blue Line running from the northeastern to the western suburbs (Saddletowne–69 Street). The routes merge and share common tracks on the downtown
transit mall A transit mall is a street, or set of streets, in a city or town along which automobile traffic is prohibited or greatly restricted and only public transit vehicles, bicycles, and pedestrians are permitted. Transit malls are instituted by communi ...
on 7th Avenue South, which also allows buses and emergency vehicles.


Downtown Transit Mall

As part of the construction of the original South leg, nine single-platform stations were built along the 7th Avenue South transit mall, which formed the 7th Avenue free fare zone. All nine stations opened May 25, 1981. The tracks run at grade in a semi-exclusive right of way, shared with buses, city and emergency vehicles. This is a free-fare zone intended to act as a downtown people mover. Fares are only required after trains exit the downtown core. Westbound stations used to consist of Olympic Plaza (formerly 1 Street E, renamed in 1987), 1 Street W, 4 Street W, and 7 Street W. Eastbound stations consisted of 8 Street W, 6 Street W, 3 Street W, Centre Street and City Hall (formerly 2 Street E, renamed in 1987). When the Northeast leg opened on April 27, 1985, two stations were added: 3 Street E serving Westbound Blue Line trains only and 10 Street W, a centre-loading platform, which served as the terminus of both Red and Blue lines, until the Northwest leg opened in 1987, after which it was the terminus for the Blue line only. As part of Calgary's refurbishment project, 3 Street E and Olympic Plaza stations have been decommissioned and replaced by the new gateway City Hall station in 2011. 10 Street W was decommissioned and replaced with the Downtown West–Kerby (formerly called 11 Street W) station in 2012.


Downtown station refurbishment

In June 2007, the City of Calgary released information on the schedule for the refurbishment of the remaining original downtown stations. The plan involved replacing and relocating most stations, and expanding Centre Street station which was relocated one block east (adjacent to the Telus Convention Centre) in 2000, to board four-car trains. The new stations have retained their existing names (with the exception of 10 Street W becoming Downtown West–Kerby in 2012); however, they may be shifted one block east or west, or to the opposite side of 7th Avenue. The refurbishment project was completed on December 8, 2012, when the Downtown West–Kerby station was opened to the public in conjunction with the West LRT opening event. *1 Street SW – new platform relocated one block east opened October 28, 2005. *7 Street SW – new platform relocated one block east opened February 27, 2009. *6 Street SW – reconstructed in original location. Original platform closed April 7, 2008 and new platform opened March 27, 2009. *8 Street SW – new platform relocated one block east opened December 18, 2009. *3 Street SW – reconstructed in original location. Original platform closed April 20, 2009 and new platform opened March 12, 2010. * 3 Street SE – permanently closed May 3, 2010. Replaced by new dual-platform City Hall Station opening July 6, 2011. *4 Street SW – reconstructed in original location. Original platform closed January 7, 2010 and new platform opened January 21, 2011. *City Hall – original Eastbound platform rebuilt with new Westbound platform to replace 3 Street E and Olympic Plaza. Original platform closed May 3, 2010 and new dual-platform station opened July 6, 2011. Olympic Plaza was closed permanently at this time. Eastbound platform re-closed following the 2011 Stampede to finish construction and officially opened September 19, 2011. *Olympic Plaza – permanently closed July 6, 2011. Replaced by new dual-platform City Hall Station. * – permanently closed and removed on September 15, 2012. The new station replacing it, which opened on December 8, 2012, has dual side-loading platforms and is located one block west. This project was initially proposed to be undertaken in 2006, following the opening of the new 1 Street W station. However, the City of Calgary decided to defer the project to coincide with the opening of the West Line and continue on with refurbishment of the other stations. This new station was initially called "11 Street W" up until the Summer of 2012 when it was renamed to Downtown West–Kerby. This required that the stations be closed during demolition and reconstruction. The new stations feature longer platforms for longer trains, better integration of the platforms into the sidewalk system, better lighting, and more attractive landscaping and street furniture. This project was shortlisted for the New/Old category in the 2012
World Architecture Festival The World Architecture Festival (WAF) is an annual festival and awards ceremony, one of the most prestigious events dedicated to the architecture and development industry. The first four events were held in Barcelona, from 2008 to 2011, at which p ...
in
Singapore Singapore (), officially the Republic of Singapore, is a sovereign island country and city-state in maritime Southeast Asia. It lies about one degree of latitude () north of the equator, off the southern tip of the Malay Peninsula, bor ...
.


Red Line

Also known as Route 201, this route comprises two legs connected by the downtown transit mall: the South leg () and the Northwest leg (). There are eleven stations on the South leg and nine on the Northwest leg. Total length of the line: .


South leg

This was the first leg of the system to be built. Seven stations on this leg opened on May 25, 1981, as the first light railway line to serve the city. From north to south, they are (renamed from Stampede in 1995), (renamed from Erlton in 1995), (renamed from 42 Avenue in 1986), , (also the site of the Haysboro LRT Storage Facility), , and (also the site of the Anderson LRT Yards). The original South line was 10.9 km long. On October 9, 2001, the line was extended south 3.4 km and two new stations were added: and , as part of the South LRT Extension Phase I. On June 28, 2004, Phase II opened adding 3 km of track and two more stations: and . A further three stations – Silverado (most likely in the area of 194th Avenue SW), 212th Avenue South, and Pine Creek (in the area around 228th Avenue SW) – are planned once the communities adjacent to their location are developed, likely beyond 2020.


Northwest leg

This was the third leg of the system to be built. Five stations on this leg opened on September 7, 1987. From the most central to the most northwesterly, they are , (the station name in full is "
Southern Alberta Institute of Technology The Southern Alberta Institute of Technology (SAIT) is a polytechnic institute in Calgary, Alberta, Canada. SAIT offers more than 110 career programs in technology, trades and business. Established in 1916, it is Calgary's second oldest post-se ...
/
Alberta University of the Arts The Alberta University of the Arts (AUArts) is a public art university located in Calgary, Alberta, Canada. The university is a co-educational institution that operates four academic schools. The institution originated from the art departme ...
/ Jubilee Auditorium"), , , and . The original Northwest leg was 5.6 km long. On August 31, 1990, the line was extended 1 km and station was opened as the new terminus. On December 15, 2003, the line was extended 3 km again and station was opened. On June 15, 2009, the line was extended 3.6 km and (formerly Crowfoot-Centennial) was opened. It was extended further by 2.5 km to Station on August 25, 2014.


Blue Line

Also known as Route 202, this route is composed of two legs connected by the downtown transit mall: the Northeast leg () and the newer West leg (). The Northeast leg has ten stations and the West leg has six stations. Total length of this route: .


Northeast leg

This was the second leg of the system to be built. Seven stations opened on April 27, 1985, from downtown to the northeast. They are: , , , , , , and . The original Northeast line was 9.8 km long. On December 17, 2007, the line was extended 2.8 km further north to an eighth station – . On August 27, 2012, another 2.9 km extension of track opened and added two more stations – and . Additional stations are proposed for development, likely beyond 2023, at 96th Avenue,
Country Hills Boulevard Country Hills Boulevard is a major expressway in Calgary, Alberta. It is notably one of the longest east-west routes in Calgary and one few routes north of Alberta Highway 1, 16 Avenue N that is mostly continuous from the west end of the city to th ...
, 128th Avenue (north of Skyview Ranch) and Stoney Trail (in the Stonegate Landing development), as those areas are developed for future LRT infrastructure.


West leg

This was the fourth leg of the system to be built, although it was included in the original plans for the system. It was built last because it was anticipated to have lower ridership and higher construction costs than the previous legs. Construction of the 8.2 kilometre (5 mile) leg began in 2009. It opened on December 10, 2012. The City of Calgary began a review process in late 2006 to update the plans to current standards, and Calgary City Council gave final approval to the project and allocated the required $566-million project funding on November 20, 2007. Funding for the project was sourced from the infrastructure fund that was created when the Province of Alberta returned the education tax portion of property taxes to the city. Construction of this leg began in 2009. It was constructed at the same time as further extensions of the NE and NW lines of the LRT system that were approved in November 2007. The West LRT leg has six stations (from east to west): (near 16th Street SW), , , (Westgate), , and (west of 69th Street near Westside Recreation Centre). The updated alignment from the 2007 West LRT Report includes the line running on an elevated guideway beginning west of the Downtown West–Kerby Station, running along the CPR right of way to Bow Trail SW, and then to 24th Street SW. The line then runs at grade past Shaganappi Point Station and drops into a tunnel to 33rd Street SW. The tunnel then runs under the
Westbrook Mall Westbrook Mall is a shopping centre in Calgary, Alberta. Its anchors are Safeway and Walmart. The Westbrook Station on the West Line of the C-Train is located adjacent to the mall. Location Westbrook Mall is located in the west part of Calgar ...
parking lot, and the former site of the now-demolished Ernest Manning Senior High School. The line then follows the north side of 17th Avenue SW past 37th Street SW below grade to 45 Street station. Past 45th Street the line runs at grade, and approaching Sarcee Trail SW moves onto an elevated guideway that passes over the freeway. The line then runs at grade to Sirocco Station, then proceeds to drop below grade and pass under eastbound 17th Avenue SW at 69th Street SW and return to grade on the south side of the avenue. The line then terminates at 69 Street Station located to the west of 69th Street SW. Three of the new West leg stations are located at grade. , , and stations are located below grade, while is an elevated station. On October 5, 2009, the city council announced approval of a plan to put a portion of the West leg into a trench at 45th Street and 17th Avenue SW, a move welcomed by advocates who fought to have it run underground. The change cost an estimated $61 million; however, lower-than-expected construction costs were expected to absorb much of the change. The cost for the project is, however,
over budget A cost overrun, also known as a cost increase or budget overrun, involves unexpected incurred costs. When these costs are in excess of budgeted amounts due to a value engineering underestimation of the actual cost during budgeting, they are known ...
by at least C$35 million and the overall cost could be more than C$1.46 billion because of soaring costs of land used and the integration of public art into the project. The public art aspect of the project was neglected in its initial form. Because City Hall regulations for big construction projects require incorporation of public art, City Hall had to find the money. Therefore, the West LRT project cost C$8.6 million more than expected. On October 29, 2009 city council announced that the contract to construct the West LRT had been awarded to a consortium led by
SNC Lavalin SNC-Lavalin Group Inc. is a Canadian company based in Montreal that provides engineering, procurement, and construction (EPC) services to various industries, including mining and metallurgy, oil and gas, environment and water, infrastructure, an ...
. Future extension of the West leg to Aspen Woods Station (around 17th Avenue and 85th Street SW) has been planned, and future extensions further west to 101st Street SW may be added as new communities adjacent to 17th Avenue SW are built. On May 15, 2012, testing of the leg began with two LRT cars. As the construction of the leg moved towards completion, four LRT cars were used, until revenue service began on December 10, 2012. In its first year of service, 69 Street served an average of 32,400 boardings per day.


Future plans

In 2011, Calgary City Council directed that a long term Calgary Transit Plan be created, taking into account the overall Calgary Transportation Plan. A steering committee and project team, comprising some Council members, City planning staff, independent business people and Calgary Transit staff, after detailed scenario planning and extensive public consultation, produced the December 2012 "RouteAhead: A Strategic Plan for Transit in Calgary". A 30-year roadmap for public transit in Calgary, RouteAhead includes a long term vision for the CTrain system. The RouteAhead plan was submitted to Council and approved in early 2013.


Existing Lines

For the Red Line, in its 30-year RouteAhead plan, the South line may be extended another 3.5 km to a possible 210 Avenue SW station. For the Blue Line, from the same plan, there are more possible extensions to the northeast to either
Calgary International Airport Calgary International Airport , branded as YYC Calgary International Airport, is an international airport that serves the city of Calgary, Alberta, Canada. It is located approximately northeast of downtown and covers an area of 20.82 squa ...
(via a spur line), or to 128 Avenue NE, or to have both. There are plans to build an additional line to the southeast from the city centre. Calgary Transit has drafted a plan for a transit-only right-of-way, known as the SETWAY (South East Transit Way) for the interim.Calgary Transit: Southeast Transitway (SETWAY)
A second, northern line is to be planned beyond 2023 but the alignment is still pending. As for a possible underground leg in downtown (under 8 Avenue South), the cost of the project will be at least C$800 million (in 2012 dollars), but its priority has been lowered because there is no funding available for it. However, the overall cost of this and other projects could be at least C$8 billion.


Green Line

This proposed future route would cross the downtown core at right angles to the downtown transit mall and connect two new legs: the Southeast leg and the North-Central leg. It would exceed the capacity of the downtown transit mall, requiring that it use a new right of way going over or under the existing transit mall. Elevated tracks would conflict with Calgary's downtown +15 system, which is the most extensive pedestrian skywalk system in the world, so this option is unlikely. Most likely the system will go underground, crossing underneath the future downtown subway, which already has a short section of tunnel built under 8th Avenue S and a
ghost station A ghost station is a disused train station through which revenue-service passenger trains (especially rapid transit trains) pass but at which they do not stop. The term is also sometimes used for any unused underground station or any unused ...
under the
Calgary Municipal Building The Calgary Municipal Building, often referred to as ''New City Hall'' is the seat of local government for the city of Calgary, Alberta, Canada. The building has been the centre for civic administration for the City of Calgary since it opened in 1 ...
. The exact routes and station locations are currently in the planning stages. Funding has been secured for the first stage of construction of the Green Line stretching from 16th avenue North through the downtown core into the Southeast to the future Shepard Station at 126th Avenue SE. It is expected to be complete by 2026. The $4.6 billion cost of the project will be shared in roughly equal portions between the federal government, the city of Calgary and the provincial government.


North leg

This leg of the Green Line would serve the residential communities of Country Hills, Coventry Hills, Harvest Hills, Panorama Hills, and other communities, possibly in the future extending as far as the nearby City of Airdrie. The Green Line North, as it has been re-designated, will be a mix of grade level and underground infrastructure extending north from the downtown core along Centre Street North. In July 2015, the Canadian federal government committed to put $1.5 billion into funding the Green Line LRT or one-third of the project's $4.6 billion cost. Discussions between the city of Calgary and the province continue with the goal of building the new light rail line instead of developing a BRT system as an interim measure. In January, 2015, Calgary City Council approved the Green Line North (formerly known as North Central LRT), setting Centre Street N as the route. In December 2015, Council approved the planning report on Green Line funding, staging, and delivery. The North leg is expected to be the first section of the Green Line to be built. Actual completion dates will depend on delivery of promised federal and provincial government funding.


Southeast leg

This leg is planned to run from downtown (although on a different routing, not following the 7th Avenue corridor) to the communities of Douglasdale and McKenzie Lake and McKenzie Towne in the southeast, and onwards past Highway 22X into the so-called "Homesteads" region east of the Deerfoot Trail extension. Eighteen stations have been planned for this route and the project is expected to be completely built by 2039. Three of the proposed downtown stations are expected to be built underground, and the rest of the line will follow the 52 Street SE corridor from Douglasdale and McKenzie Towne to Auburn Bay (south of Highway 22X) and then wind its way through Health Campus (adjacent to the southeast hospital) and Seton. Unlike Routes 201 and 202, which use
high-floor High-floor describes the interior flooring of commuter vehicles primarily used in public transport such as trains, light rail cars and other rail vehicles, along with buses and trolleybuses. Interior floor height is generally measured above the ...
U2 and SD-160 LRVs, the eastern route is expected to employ
low-floor Accessibility is the design of products, devices, services, vehicles, or environments so as to be usable by people with disabilities. The concept of accessible design and practice of accessible development ensures both "direct access" (i. ...
LRVs, such as the
Bombardier Flexity Outlook The Bombardier Flexity Outlook is a series of low-floored, articulated light-rail trams manufactured by Bombardier Transportation. Part of the larger Bombardier Flexity product line (many of which are not low-floor), Flexity Outlook vehicles are ...
or the
Siemens S70 The Siemens S70, its successor the S700 and European variant, the Avanto, are a series of low-floor light-rail vehicles (LRV) and streetcars manufactured by Siemens Mobility, a division of German conglomerate Siemens AG. The S70 and S700 are ...
. From north to south, the proposed stations are: Eau Claire, Central (at 6 Avenue), Macleod Trail, 4 Street SE, Ramsay/Inglewood, Crossroads, Highfield, Lynnwood, Ogden, South Hill, Quarry Park, Douglasglen, Shepard, Prestwick, McKenzie Towne, Auburn Bay/Mahogany (at 52nd Street), Health Campus/Seton (the station likely will share the name of the hospital and expected to be completed by 2039), with further stations to the south expected in the future. Construction of the South East LRT would cost over C$2.7 billion over 27 years. Because there was no funding available, the city laid out plans to build a transit way for the South East BRT known as SETWAY. Open houses to explore the idea of a transit way for the South East occurred in the South East communities of Ramsay, Riverbend and McKenzie Towne in January 2012. Between 1999 and 2006 Calgary Transit conducted studies for the South East LRT to find ways to make improvements of overall transit use in the South East for short term while having LRT being the long-term goal. On December 3, 2016, it was announced that an additional C$250 million in additional funding was allocated in a joint venture by the Federal and Provincial Governments. This comes in line with a possible final cost estimate of the South East LRT to be announced in March 2017.


Spur line to Calgary International Airport

Calgary Transit's C$8 billion, 30-yea
RouteAhead
plan, approved in 2013, includes a connection from downtown Calgary to
Calgary International Airport Calgary International Airport , branded as YYC Calgary International Airport, is an international airport that serves the city of Calgary, Alberta, Canada. It is located approximately northeast of downtown and covers an area of 20.82 squa ...
, which may take initial form as a Route 202
spur line A branch line is a phrase used in railway terminology to denote a secondary railway line which branches off a more important through route, usually a main line. A very short branch line may be called a spur line. Industrial spur An industr ...
. Th
Airport Trail road tunnel
which opened on May 25, 2014, was built with room to accommodate a future two-track CTrain
right-of-way Right of way is the legal right, established by grant from a landowner or long usage (i.e. by prescription), to pass along a specific route through property belonging to another. A similar ''right of access'' also exists on land held by a gov ...
.


Other future improvements

In late 2015, Calgary Transit completed upgrading its entire system to operate four-car trains instead of the original three-car trains. When enough new LRVs are delivered to lengthen all trains to four cars, this will increase the rush-hour capacity of the system by 33%. By 2023, Calgary Transit also plans to begin decommissioning some of the original Siemens-Duewag U2s (as of 2010 80 of the original 83 were in use, and nearing 29 years of service, by 2023 they will be 42 years old). Calgary Transit has ordered some 60 new
Siemens S200 The Siemens S200 is a high-floor light rail vehicle (LRV) manufactured by Siemens Mobility in Florin, California. The S200 succeeds the SD-100, SD-160, SD-400 and SD-460 as the high-floor light rail vehicle for the North American market and i ...
LRV cars to replace 28 of the existing U2s in addition to lengthening many of the trains to four cars. Calgary transit has also integrated a new mobile ticketing system which allows riders to buy CTrain and other Calgary Transit tickets and passes anytime from anywhere with the use of a smartphone. This system, dubbed "My Fare" was rolled out at the end of July 2020, but faced issues at launch such as the incompatibility with Apple's iOS devices.


Further underground infrastructure

In addition to numerous tunnels to allow trains to pass under roadways, geographic features, and mainline railways, there are other notable underground portions of Calgary's CTrain system. Part of the system through downtown is planned to be transferred underground when needed to maintain reliable service. Given this, portions of the needed infrastructure have been built as adjacent and associated land was developed. As a result of this original plan, when the City of Calgary built a new Municipal Building, it built a short section of tunnel to connect the existing CPR tunnel to the future tunnel under 8th Avenue S. The turnoff to this station is visible in the tunnel on the Red Line entering downtown from the south, shortly before City Hall. However, after
urban explorer Urban exploration (often shortened as UE, urbex and sometimes known as roof and tunnel hacking) is the exploration of manmade structures, usually abandoned ruins or hidden components of the manmade environment. Photography and historical inte ...
s discovered the tunnel and visited it during a transit strike, the city walled off the spur tunnel with concrete blocks. As the population of metropolitan Calgary increases and growing suburbs require new lines and extensions, the higher train volumes will exceed the ability of the downtown section along 7th Avenue S to accommodate them. To provide for long-term expansion, the city is reviewing its plans to put parts of the downtown section underground. The current plans allow the expanded Blue Line (Northeast/West) to use the existing 7th Avenue S surface infrastructure. The expanded Red Line (Northwest/South), now sharing 7th Avenue S with the Blue Line, will be relocated to a new tunnel dug beneath 8th Avenue S. The future Southeast/Downtown route will probably enter downtown through a shorter tunnel under one or more streets (candidates include 2nd Street W, 5th Street W, 6th Street W, 8th Avenue S, 10th Avenue S, 11th Avenue S, and 12th Avenue S). Although Calgary City Council commissioned a functional study for the downtown metro component of the CTrain system in November 2007, the city is unlikely to complete this expansion before 2017 unless additional funding is received from provincial or federal governments. The cost of bringing the potential underground leg under 8 Avenue South could be at least C$800 million, according to Calgary Transit's 30-yea
RouteAhead
plan.


Stations

There are 45 stations in the CTrain system on 2 distinct lines. The typical station outside the downtown core allows for several methods of passenger arrival and departure. Many CTrain passengers travel to and from suburban stations on feeder bus routes that wind their way through surrounding neighbourhoods. Another popular option is a
park and ride A park and ride, also known as incentive parking or a commuter lot, is a parking lot with public transport connections that allows commuters and other people heading to city centres to leave their vehicles and transfer to a bus, rail system ( ...
lot, in which commuters drive to a station by car and then transfer to a CTrain to complete their journey. Alternatively, some CTrain passengers disembark at drop-off zones from vehicles travelling elsewhere; because many of these commuters are conveyed by their spouses, these zones are branded as
Kiss and Ride A park and ride, also known as incentive parking or a commuter lot, is a parking lot with public transport connections that allows commuters and other people heading to city centres to leave their vehicles and transfer to a bus, rail system (r ...
areas.


Ridership

The CTrain's high ridership rate and cost effectiveness can be attributed to a number of factors. The nature of Calgary itself has encouraged CTrain use. Calgary has grown into the second largest head office city in Canada, with a very dense downtown business district. Most of the head offices are crowded into about of land in the downtown core. In the last half century the population of Calgary has grown dramatically, outpacing the ability of roads to transport people into the city centre, while the central business district has grown up vertically rather than spread out into the suburbs. Historically, Calgary residents, particularly its influential inner city community associations, voted against proposals to build major freeways into its city centre, forcing new commuters to use transit as their numbers increased while downtown street and freeway capacity remained the same. City planners limited the number of parking spaces in the downtown core since the narrow downtown streets could not allow more traffic to park. At the same time, Calgary's maturation as a globally influential head office city caused many surface parking lots to be replaced by new skyscrapers, which increased office workers while reducing parking spaces. This eventually made it prohibitively expensive for most people to park downtown. The shortage of downtown parking caused fees to become among the most expensive in North America. As a result, in 2012 50% of Calgary's 120,000 downtown workers used Calgary Transit to get to work, with a long-term goal of growing that proportion to 60% of downtown workers. Forward planning for the CTrain played an important role. Although the light rail system was not chosen until 1976, the city planners had proactively reserved transit corridors for some form of high capacity transport during the 1960s, and the right-of-ways for the system were reserved when Calgary's population was less than 500,000, whereas today it is well over twice that number. Bus rapid transit lines were put in place along future routes to increase commuter numbers prior to constructing proposed future LRT lines. Rather than demolishing buildings, the city reached an agreement with
CP Rail The Canadian Pacific Railway (french: Chemin de fer Canadien Pacifique) , also known simply as CPR or Canadian Pacific and formerly as CP Rail (1968–1996), is a Canadian Class I railway incorporated in 1881. The railway is owned by Canadi ...
to build most of the south line in available space inside an existing CPR right-of-way. Large parts of the other lines were built in the medians and along the edges of freeways and other major roads. Automobile driver objections were muted by adding extra lanes to roads for cars at the same time as putting in the LRT tracks, which reduced costs for both, and by adding grade-separating intersections which reduced both driver and train delays. The lines and stations were placed to serve large outlying suburbs and the central and other business districts, and to serve existing and predicted travel patterns. Costs were controlled during construction and operation of the system by going with the lowest bidder and using relatively cheap, commercially available technology without regard for "buy Canadian" policies. This has worked out well for a pioneer system because the German technology chosen has since become a more or less standard design for most North American LRT systems, and compatible new-generation equipment with new features is available off-the-shelf. A grade-separated system was passed over in preference for a system with few elevated or buried segments, and the trains and stations selected were of the tried and tested, utilitarian variety (for example, vehicles were not air conditioned, storage yards were not automated, and stations were usually modest concrete platforms with a shelter overhead). This allowed greater amounts of track to be laid within available budgets. The CTrain reduced fare collection costs by using an honour system of payment. Transit police check passenger tickets at random, and fines are set at a level high enough that those who are caught pay the costs for those who evade detection. Staffing costs were kept low by employing a minimum number of workers, and because the system is all-electric (wind powered) it can run all night with only 1 driver per train and 2 people in the control room. It now runs 22 hours per day without significantly increased overhead. (The other 2 hours are reserved for track maintenance). Although not universally grade separated, the CTrain is able to operate at high speeds on much of its track because it is separated from traffic and pedestrians by fences and concrete
bollards A bollard is a sturdy, short, vertical post. The term originally referred to a post on a ship or quay used principally for mooring boats. It now also refers to posts installed to control road traffic and posts designed to prevent automotive v ...
. The downtown 7th Avenue transit way is limited to trains, buses, and emergency vehicles, with private cars prohibited. Trains are given priority right of way at most road crossings outside of downtown. As a result, trains are able to operate at outside of downtown, and along the 7th Avenue corridor. 7th Avenue is a free fare zone, intended as a downtown people-mover to encourage use for short hops through the downtown core. The city manages to achieve very high transit capacity on the 7th Avenue transit corridor by staging the traffic lights, so that all the trains move forward in unison to the next station on the synchronized green lights, and load and unload passengers on the intervening red lights. The trains are now 1 block long, but buses occupy the empty gaps every second block between trains and the buses unload and load passengers while the trains pass them. In 2001, the U.S.
General Accounting Office The U.S. Government Accountability Office (GAO) is a legislative branch government agency that provides auditing, evaluative, and investigative services for the United States Congress. It is the supreme audit institution of the federal gover ...
released a study of the cost-effectiveness of American light rail systems. Although not included in the report, Calgary had a capital cost of US$24.5 million per mile (year 2000 dollars), which would be the sixth lowest (Edmonton was given as US$41.7 million per mile). Because of its high ridership (then 188,000 boardings per weekday, now over 300,000) the capital cost per passenger was $2,400 per daily passenger, by far the lowest of the 14 systems compared, while the closest American system was Sacramento at $9,100 per weekday passenger). Operating costs are also low, in 2005, the CTrain cost $163 per operating hour to operate. With an average of 600 boardings per hour, in 2001 cost per LRT passenger was $0.27, compared to $1.50 for bus passengers in Calgary.


Facilities

* Anderson Garage – LRV indoor storage and training facilities * Haysboro Garage – small indoor and outdoor LRV storage; LRV yard and Turner Storage Area *
Oliver Bowen Oliver Bowen (December 21, 1942 – January 1, 2000) was a Canadian engineer who managed the design and construction of the first line of Calgary's light rail transit system: the CTrain. The City of Calgary acknowledged his engineering work by n ...
Maintenance Centre – major LRV repair and shops; storage for 60 cars (and up to 108 cars after expansion)


See also

*
Calgary municipal railway The Calgary municipal railway operated a system of streetcar routes in Calgary, Alberta, from 1909, until 1950. From 1909 to 1910 the system was named the ''"Calgary Electric Railway"''. In 1909, and early 1910, the system was known as ...
*
Light rail in Canada Urban rail transit in Canada encompasses a broad range of rail mass transit systems, including commuter rail, rapid transit, light rail, and streetcar systems. Terminology * "Commuter rail" refers to urban passenger train service between a ...
* Light rail in North America * List of tram and light-rail transit systems


References


External links


Calgary Transit's official website



Greenline (Previously SETWAY)

transit.mtroyal.ca
(Google Maps visualization of Calgary Transit data)

* by the City of Calgary. {{Canadianmetros Railway lines opened in 1981 Light rail in Canada 600 V DC railway electrification 1981 establishments in Canada Electric railways in Canada